Original Condition on Closing Day - October 28, 2019

Plans - Everything will be replaced - cabinets, floor, lights, and fixtures.  The floors will be tiled.  The shower will be tiled.  The tub will be replaced with a shower.  The wallpaper will be stripped and the moulding will be painted white while leaving the doors as natural wood.  The existing window will be retained but painted white.  It will be replaced in the future.

Revised plans - The shower walls will not be tiled but will be part of a wall system called Utile with a tile look.  The moulding will be replaced with a craftsman-style look.







Week 26 - Monday, April 20

Installed shower walls.  Repaired shower walls and ceiling.



Week 25 - Monday, April 13

Contractor installed counter top.  Repaired and primed shower ceiling.



Week 24 - Monday, April 6

Painted vanity wall.  Installed light. Painted walls.  Installed and painted moulding.



Week 23 - Monday, March 30

No significant changes as work was focused in other areas.

Week 22 - Monday, March 23

Installed moulding and closet shelves.  Repaired walls.



Week 21 - Monday, March 16

Painted walls.  Cut and painted moulding.  Contractor installed cabinet.  Plumber finished under sink.





Week 20 - Monday, March 9

Finished tile floors with grout.  Painted door jambs.  Removed mirror.




Week 19 - Monday, March 2

Finished tiling floor.  Painted closet.



Week 18 - Monday, February 24

Finished installation of shower base.  Installed tiles on floor excepting for last row under cabinet.


Week 17 - Monday, February 17

Installed concrete backerboard on floors.  Started tile layout and finished cutting tiles.



Week 16 - Monday, February 10

Plumber installed drain in shower pan.  Installed subfloor, shower ceiling, and shower light.



Week 15 - Monday, February 3

No significant changes as work was focused in other areas.

Week 14 - Monday, January 27

No significant changes as work was focused in other areas.

Week 13 - Monday, January 20

No significant changes as work was focused in other areas.

Week 12 - Monday, January 13

Plumber installed shower fixture and cleaned up sink connections in preparation for cabinet installation.



Week 11 - Monday, January 6

No significant changes as work was focused in other areas.

Week 10 - Monday, December 30

Christmas travel - no work.

Week 9 - Friday, December 20

No significant changes as work was focused in other areas.

Week 8 - Monday, December 16

No significant changes as work was focused in other areas.

Week 7 - Monday, December 9

No significant changes as work was focused in other areas.

Week 6 - Monday, December 2

Due to Thanksgiving travel, no significant changes as work was focused on vendor contacts.

Week 5 - Monday, November 26

Removed mouldings and tub.  Installed insulation in shower ceiling.



Week 4 - Monday, November 19

Removed cabinet.  Contractors removed tile floor and subfloor.


Week 3 - Monday, November 12

No significant changes as work was focused in other areas.

Week 2 - Monday, November 5

No significant changes as work was focused in other areas.

Week 1 - Monday, October 28

Removed curtains and hardware.  Removed mullions from windows.  