This week was one step but several steps forward. I tried to take up the wood floor in the great room and discovered that it was glued to a chipboard subfloor. The effort to get 3 feet of floor removed told me that this was not the best use of my time. We hired a crew to remove all of the floors on the main level down to the lowest subfloor. It will take them several days and several tons of debris, but we will have a single level of flooring on which to build. With 2 wood floors, tile floors, carpet, and vinyl floors, the layers were at different levels.
At the same time, we changed our thoughts on the mouldings. We originally planned to keep the traditional mouldings but paint them white to update the look. As our decorating plans evolved, we decided that a craftsman look appealed to us. So I ordered the crew to take it all down. That means the priming and caulking we had done was wasted effort. Luckily, we hadn't made it far. It also meant that more damage was done to the walls as the caulking stuck to the wallpaper. The crew was a little bit like having a bull in a china shop so there a lot of repairs.
Foyer - Original
|
Foyer - Week 2
Removed chair rail and began
wall repair.
|
|
Foyer - Week 3
Completed wall repair. Removed
chair rail. Primed walls and
mouldings. Caulked mouldings. |
Foyer - Week 4
Removed wood floor and subfloor. Removed mouldings.
Foyer - Original
|
Foyer - Week 3
Completed wall repair. Removed
chair rail. Primed walls and
mouldings. Caulked mouldings. |
Foyer - Week 4
Removed wood floor and subfloor. Removed mouldings.
Great Room - Original
|
Removed blinds and hardware.
|
Great Room - Week 4
Removed wood floor and subfloor. Removed mouldings.
|
Removed curtains, blinds, and
hardware. Began wallpaper
|
|
Completed wallpaper removal.
Began removal of chair rail
and wall repair.
|
Kitchen - Week 4
Removed base cabinets.
|
Completed wallpaper removal.
|
|
Kitchen - Week 3
Completed chair rail removal.
Primed and caulked some mouldings. |
Kitchen - Week 4
Removed base cabinets.
Kitchen - Original
Kitchen - Week 4
Removed base cabinets.
Den - Original
|
Den - Week 1
Removed curtains, blinds, and
brackets. Removed mullions
from windows.
|
Den - Week 4
Removed carpet. Started removal of wall boards.
Laundry - Original
|
Laundry - Week 1
Removed curtains, blinds, and
hardware. Removed mullions
from windows.
|
|
Replaced dryer vent, removed
shelves, and repaired walls.
|
Laundry - Week 4
Removed mouldings.
Hall - Original
Hall - Week 4
Removed mouldings.
Master Bedroom - Original
|
Master Bedroom - Week 1
Removed curtains, blinds, and
hardware. Removed saloon doors.
|
Master Bedroom - Week 4
Primed walls. Removed carpet and subfloor. Removed mouldings.
Master Bedroom - Original
Master Bedroom - Week 4
Primed walls. Removed carpet and subfloor. Removed mouldings.
Master Bathroom - Original
Master Bathroom - Week 4
Removed tile floor and subfloor. Removed mouldings. Removed cabinet.
Master Bathroom - Original
|
Began dissembling the shower
by breaking walls to determine
water and electric line locations.
|
|
Completed the tub removal
including rewiring the light switch
to move it from the shower area.
The shower took 2 full days.
|
Master Bathroom - Week 4
Removed tile floor and subfloor. Removed mouldings. Removed toilet and bidet.
Master Closet (Large) - Original
|
Master Closet (Large) - Week 1
Removed curtains, shelves, and hardware.
Removed mullions from windows.
Repaired holes with spackle.
|
|
Master Closet (Large) - Week 2
Removed blinds and carpet.
Painted walls with primer.
|
Master Closet (Large) - Week 4
Removed subfloor. Removed mouldings. Installed closet light.
Guest Bedroom - Original
|
Removed curtains, blinds,
and hardware.
|
Guest Bedroom - Week 4
Started removal of mouldings.
Guest Bathroom - Original
|
Removed curtains and
hardware. Removed mullions
from windows.
|
Guest Bathroom - Week 4
Removed tile floor and subfloor. Removed cabinet.