Week 2 - Monday, November 5
Photos taken on or before Monday, November 5.
Week 2 of our renovation work was a lot harder than the first week. I have determined that this house is pretty well put together. It took all week just to get the shower and tub out. I did take some time to start putting things back together and allow Susan to do some of the lighter work.
Foyer - Original
Great Room - Original
Week 2 of our renovation work was a lot harder than the first week. I have determined that this house is pretty well put together. It took all week just to get the shower and tub out. I did take some time to start putting things back together and allow Susan to do some of the lighter work.
Foyer - Original
Foyer - Week 2
Removed chair rail and began wall repair.
Foyer Closet - Week 1
Removed wallpaper.
|
Foyer Closet - Week 2
Repaired wall.
Great Room - Week 1
Removed blinds and hardware.
|
Great Room - Week 2
Kitchen - Original
Completed wallpaper removal. Began removal of chair rail and wall repair.
Kitchen - Original
Kitchen - Week 2
Completed wallpaper removal.
Laundry - Original
Laundry - Week 1
Removed curtains, blinds, and
hardware. Removed mullions
from windows.
|
Laundry - Week 2
Replaced dryer vent, removed shelves, and repaired walls.
Master Bathroom - Original
Master Bathroom - Week 1
Began dissembling the shower
by breaking walls to determine
water line locations.
|
Master Bathroom - Week 2
Completed the tub removal. This took 3 full days. The more I try to take this house apart, the more I discover that it is well built.
This is a picture of the tub partially removed. It shows that the tile was attached to a layer of concrete that was an inch or more thick.
The platform on the ends and back were tiled. Below the tile was the 1"+ of concrete, a layer of 3/4" plywood, and 2 layers of 2" wood. The picture beloe shows the bottom of the plywood. It resembles a bed of nails.
Master Bathroom - Original
Master Bathroom - Week 1
Began dissembling the shower
by breaking walls to determine
water and electric line locations.
|
Master Bathroom - Week 2
Completed the tub removal including rewiring the light switch to move it from the shower area. The shower took 2 full days.
Due to the wet work of wallpaper removal and the electrical work in the bathroom, I have spent several hours mapping portions of the electrical system to the appropriate circuit breaker.